Primary school extension

Project Information

Location: Hackney, London
Main Contractor: Mansell

The Challenges

Construction of a new single and two storey teaching and dining block to an existing primary school, including new playground facilities close to the Olympic Park.

Structural engineering works included:

  • Remove existing tarmac play area
  • Divert existing drainage
  • Reduced dig
  • Piling attendance
  • Cut down piles
  • Reinforced concrete beams
  • Reinforced concrete slabs
  • Two storey finished reinforced concrete stair spine wall
  • New services
  • Play area