IMG 0184

Battersea Park

Posted by Default Admin In Construction / Tagged Commercial / 02 Nov 2015

Installation of piled reinforced concrete foundation to secure poles for Zip wires in Battersea Park 

Principle Contractor: Go Ape

Architect: Altus Outdoor Concept

Structural Engineer: Altus France

 

Challenge:

Excavate pad foundations on average 2.5m deep, insert screw piles and reinforced cages with 900mm long holding down bolts. Fill with concrete.

IMG 0414IMG 0187IMG 0061