385A8F89 9510 460F BC63 8A86890C8016

10 Ennismore Mews

Posted by Default Admin In Construction / Tagged Residential / 30 Oct 2015

Patterson Construction were instructed by Redfield Capital to demolish and reconstruct a mews house including forming a new basement while retaining the facades and party walls.

 

Principle Contractor: Patterson Construction

Architect: Berman Guedes Stretton

Structural Engineer: LIM Engineers

 

Challenge:

Remove existing ground floor, underpin to a depth of 4.5m, install part permanent steel and temporary works. Construct ground floor, demolish and reinstate upper floors and roof. Waterproof with Delta membrane discharging into the main public sewer. 

 